Yichang Subway

Yichang subway is scheduled to operate three metro lines in the future. Subway Line 2 will start construction in 2017. Line 1 and line 3 will be constructed in 2018 and 2019 respectively. By 2023, the rail transit in the city will be around 45 miles (72 kilometers).

Yichang metro line 1 is planned to connect Jiangjiawan and Longquan with the total length of around 27 miles (44 kilometers). It will cover the main commercial areas and transportation hubs, such as East Railway Station, Yiling Bus Station and Yiling Square. Line 2 will start from Yiling Square and end at Yidu, covering around 37 miles (60 kilometers) and including 22 stations via Sanxia Airport. Line 3 will run between Caijiahe and Qiaobian. After being completed, passengers can take subway line 1 and transfer to line 2 & line 3 at Yiling Square. According to the long-term plan, Yichang will add subway line 4 to the urban rail transit system by the end of 2040.

Construction Stages

Stage One (2017-2023): Phase One of Line 1, Line 2 and Line 3
Stage Two (2023-2030): Phase Two of Line 1, Line 2 and Line 3
Stage Three (after 2030): Phase Three of Line 1, Line 2 and Line 3

Yichang Subway Lines and Stations

 Line 1: Jiangjiawan – Longquan (U-shaped)
(Identification Color:  red          )
This line will start from Jiangjiawan Road and pass the areas of Yixing Avenue, Yemingzhu Road, Yiling Road, Jucheng Road, Yidang Road and Hanyi Road.
Length: 27 miles (44 kilometers)
Station Number: 26
Stations: Jiangjiawan – Tanjiabang – Shicaichang – Yiling Bus Station – Pinghu Theater – Wanfu Plaza – Shanghai Middle School – China Three Gorges University – Donghu 1st Road – Xiling 2nd Road – Yiling Square – Yunji Road – Shengli 3rd Road – Central Hospital – Gangyao Road – Baota Road – Jiangjing 1st Road – Jinxin Commercial Square – East Railway Station – Dongzhan 1st Road – Huayan – Liujiawan – Chachang 2nd Road – Chachang Road - Liangtianfan Road – Longquan

 Line 2: Yiling Square – Yidu (south-north)
(Identification Color: blue         )
This line will cover Yuji Road Commercial District, East Railway Station and other passenger distribution centers.
Length: 37 miles (60 kilometers)
Station Number: 22
Stations: Yiling Square – 3rd People’s Hospital – Zhongnan Road – Chengdong Hotel – East Railway Station – Dongzhan 1st Road – Wajiachong – Gaojiawan – Zhengjiawan – North Zhangjiawan Road – Huanglong Temple – Airport Road – Sanxia Airport – Shanyao Road – Taozichong – Yihua – Xiyao Road – Middle Baiyang Road – Baiyang – Zhangjiahe – Shilipu – Yidu

 Line 3: Caijiahe – Qiaobian (east-west)
 (Identification Color: light green          )
Metro line 3 will connect Xingyi Road and Jiangjun Road in Dianjun District via Yichang South Railway Station. This line will pass Fazhan Avenue, Xiling 1st Road and Yangtze River Tunnel.
Length: 20 miles (32 kilometers)
Station Number: 19
Stations: Caijiahe – Nanping – Shicaichang – Chenguang Road – Meiziya – Qingjiang Runcheng – Liujiawan – Dongshan Public Transportation Hub – Economic Development Zone – Chengdong – Yiling Square – Shimao – Sports Park – Paifangpo – Zhanqian 1st Road – South Railway Station – Wangjiahe – Changning – Qiaobian

 Line 4: Changjiang Market - Gongyi 1st Road (south-north)
 (Identification Color: brown         )
Length: 13 miles (21 kilometers)
Station Number: 12
Stations: Changjiang Market – Shanghai Middle School – Qinghe Road – Dongshan Public Transportation Hub – North Gangyao Road – Lijiawan – Liujiawan – Lianghe Road – Dongjiachong – East Railway Station – Gonglian Road – Gongyi 1st Road
- Last updated on Oct. 18, 2018 -