Haikou Metro

At present, Haikou metro lines are still under planning, and it is intended to develop 4 lines with a total length of 134 kilometers (83 miles). According to the long-term plan, these 4 rail transit lines will open in 2020. The tram line 1 phase one starting from the New Seaport Wharf to Baishamen Park will stretch around 25 kilometers (15.5 miles) from the west to the east. It will mainly go across Changye Road, Binhai Avenue, Changdi Road and Renmin Avenue via 32 stations. The metro line 2 is planned to start from Haikou Railway Station to Dongzhai Port by 12 stations, running through Haiyun Road, Bailong Road, Fengxiang Road and Baishuitang Road.

In addition, Haikou subway line 3 will connect Jiangdong District and Shuicheng District together via 5 stations, which will mainly pass Qiongshan Avenue and North Airport Road. Notably, this line will start from Haikou Railway Station to Meilan International Airport. The metro line 4 will go through Xinbu Island and Hainan Province Nongkeng Hospital via 9 stations and will primarily distribute on Changdi Road, North Bailong Road, South Bailong Road, Qiongzhou Avenve, West Fengxiang Road, Shangao Road and Baishuitang Road.
 

The Metro Lines Under Construction:


 Line 1 (Tram Line): New Seaport Wharf – Baishamen Park
Tram line 1 will link Haibin District and Binjiang District, serving as the major sightseeing and transportation line.
Length: 25 kilometers (15.5 miles)
Opening Time: 2020
Station Number: 32
Transfers:
Haikou Railway Station (transfer with line 2 and line 3)
Changdi Road (transfer with line 4)
West Binjiang Road (transfer with line 2)
Linggui Road (transfer with line 2)
Meilan International Airport (transfer with line 3)
Main Route: Jinsha Bay – Yuehai Avenue – Main Railway Station – Binhai Avenue – Qiuhai Avenue – Longhua Road – Bailong Road – Changdi Road – Nandujiang Avenue – West Binjiang Road – North Airport Road – Linggui Road – Haikou Ring Road – Meilan International Airport

 Line 2: Haikou Railway Station – Dongzhai Port 
This line will pass through Bailong District and will meet the intercity rail lines at the New Hakou Station. It will farther go across Jinpan, Yaogu Industrial Park and China Leiqiong Volcanic Cluster Global Geopark.
Length: Unsettled
Opening Time: 2020
Station Number: 12
Transfers:
Haikou Railway Station (transfer with line 1 and line 3)
Yongwan Road (transfer with line 4)
West Binjiang Road (transfer with line 1)
Linggui Road (transfer with line 1)
Stations: Main Railway Station – Chuangye Road – Yongwan Road – Qiaozhong Road – North Longkun Road – Haifu Avenue – West Binjiang Road – Yehai Avenue – Linggui Road – Haiwen Highway – Jiangdong 19th Road – Dongzhai Port

 Line 3: Haikou Railway Station – Meilan International Airport
Metro line 3 will connect the Jiangdong District and Shuicheng District together, passing by the Qiongshan Avenue and North Airport Road. The stations will be primarily built under the ground of main city area.
Length: Unsettled
Opening Time: 2020
Station Number: 5
Transfers:
Haikou Railway Station (transfer with line 1 and line 2)
Meilan International Airport (transfer with line 1)
Stations: Main Railway Station – Changliu Xiuying Community – South Long-distance Bus Station – New Haikou – Meilan International Airport

 Line 4: Xinbu Island Park – Xinying Transportation South
Most stations of this line will distribute under the ground of main city area and Xinbu Island Park Station will be built on the viaduct.
Length: Unsettled
Opening Time: 2020
Station Number: 9
Transfers:
Changdi Road (transfer with line 1)
Yongwan Road (transfer with line 2)
Stations: Xinbu Island Park – Changdi Road – Guoxing Avenue – Hongchenghu Road – East Fengxiang Road – Qiongzhou Avenue – South Longkun Road – Yongwan Road – Xinying Transportation South
- Last updated on Apr. 10, 2024 -